Skip to content
Joseph Cameron Homes

Lot to keys

The custom home building process, stage by stage

A Joseph Cameron custom home moves through seven stages: meeting Mark, finding the lot, architecture and engineering, systems design, selections, the build, and the final walk-through. Homes under 5,000 square feet take about 180 days in all.

Grand curved staircase with an iron rail in a Joseph Cameron custom home

The seven stages

  1. Breakfast room overlooking an arched stone patio, Joseph Cameron Homes

    01

    Coffee first

    Before anything is drawn, you meet Mark in person, over coffee or lunch. You talk through how you live, the rooms you want, the budget, and the timing.

  2. Cream stone home set among mature oak trees, Joseph Cameron Homes

    02

    Finding the lot

    Mark has held a Texas real estate broker license since 1984. He helps you judge a lot before you buy it, and can list your current home while the new one is built.

  3. Layered crown molding and a tray ceiling detail, Joseph Cameron Homes

    03

    Architecture and engineering

    Plans are drawn with the architect, then engineered for the site. Joseph Cameron homes have been drawn by Heritage Designs, Chris Hough, Jon Bolton Designs and Robert Thacker & Associates.

  4. Copper-finished tray ceiling with a chandelier, Joseph Cameron Homes

    04

    Systems design

    Heating and cooling, electrical, plumbing and lighting are planned around the rooms before framing starts, so the house works as well as it looks.

  5. Stacked stone feature wall beside a freestanding tub, Joseph Cameron Homes

    05

    Selections with designers

    Lighting, plumbing and interior designers walk you through every choice, from paint colors and tile to fixtures, floors and ceilings.

  6. Grand curved staircase with an iron rail, Joseph Cameron Homes

    06

    Permit and build

    A dedicated crew of craftsmen and artisans builds the house. Mark runs the job himself, and you have one person to call the whole way through.

  7. Stone and timber custom home at dusk with the lights on, Joseph Cameron Homes

    07

    Final walk-through

    You walk the finished house with Mark before closing. After you move in, warranty requests go straight to him through a short online form.

How long a custom home takes

Size sets the timeline more than anything else. These figures run from start to move-in and already include plans, design and permit.

Homes under 5,000 sq ft
180 days
Homes over 5,000 sq ft
270 to 360 days

Where to go from here

See what the selections stage involves on the design and selections page, read about luxury custom homes in Colleyville, or browse the photographs of finished homes.

Process questions

How long does it take to build a custom home?

A custom home under 5,000 square feet takes about 180 days. A home over 5,000 square feet takes 270 to 360 days. Those times run from start to finish, covering plans, design, permit and construction, up to move-in.

Can you help me find a lot?

Yes. Lot selection is the first part of every build. As a licensed broker, Mark can help you find and buy a lot, and he will tell you what a lot means for the design and the budget before you commit.

Do you have an interior designer?

Yes. Joseph Cameron Homes works with lighting, plumbing and interior designers who help with every selection, from paint colors and tile to bathroom fixtures, light fixtures, flooring and ceilings.

How do I request warranty service?

Homeowners send a warranty request through the form on the warranty page, with the home address and closing date. It goes straight to Mark.

The first stage is a cup of coffee.

Mark would rather meet in person, over coffee or lunch, before anything gets drawn. Call (214) 534-4558 or send a few lines about your plans.